Our Work

Watson Marlow

Description

Hodess delivered a 42,500 sf ISO 7 validated cleanroom facility for medical device manufacturing under a design-build model. The project was constructed within an existing office and warehouse building, converting the space into a controlled production environment.

The scope included ISO 7 cleanroom manufacturing areas and a dedicated mechanical mezzanine to support building systems. New mechanical and process infrastructure was installed to maintain environmental control throughout the facility.

The cleanroom was built using insulated metal panel systems with a walkable ceiling design to allow for service access above the controlled space.

Industry

Medical Device

Project Delivery

Design Build

ISO Class

ISO 7

Similar Projects

WL Gore

WL Gore engaged Hodess under a design-assist for the development of a 10,000 sf ISO 7 cleanroom facility in Elkton, Maryland. The project supported…

View Project
Nelipak

Nelipak engaged Hodess to deliver a 30,000 sf cGMP ISO Class 7 cleanroom and CNC support spaces in Winston-Salem, North Carolina under a design-build…

View Project
Avantor

Avantor engaged Hodess to design and construct a 10,000 sf ISO 7 and ISO 8 medical device assembly cleanrooms within an existing warehouse facility…

View Project
You have questions. We have straight answers.