Our Work

GE Healthcare Tool Installation East Greenbush, NY

Description

Hodess was the design-build cleanroom contractor for Turner Construction’s Bay Chase cleanroom project. GE Healthcare contracted Hodess directly for tool installation in a 40,000 sf ISO 5 cleanroom, utilizing modular 2″ and ½” aluminum wall panel systems. Additionally, Hodess constructed 16,000 sf of ISO Class 7 space with 2″ aluminum cleanroom grid and vinyl flooring. Responsible for designing and installing all process utilities for the tool installation, the project achieved its first LEED Gold certification. The design saved approximately $1M annually in energy costs by maintaining room specifications with lower airflows.

Industry

Medical Device / Microelectronics

Project Delivery

Design Assist

ISO Class

ISO 5, 6, 7

Similar Projects

WL Gore

WL Gore engaged Hodess under a design-assist for the development of a 10,000 sf ISO 7 cleanroom facility in Elkton, Maryland. The project supported…

View Project
Nelipak

Nelipak engaged Hodess to deliver a 30,000 sf cGMP ISO Class 7 cleanroom and CNC support spaces in Winston-Salem, North Carolina under a design-build…

View Project
Watson Marlow

Hodess delivered a 42,500 sf ISO 7 validated cleanroom facility for medical device manufacturing under a design-build model. The project was constructed within an…

View Project
You have questions. We have straight answers.